Sample Projects

ZIV Trans (002).png

Project 2

Virtual Power Plant / Energy Market

Core

Constraint Manager

Predictor

Virtual Power Plant

Future Services

 

Energy Market - Virtual Power Plant (VPP)

​

This project demonstrates an large distribution network. The system includes an interactive energy market where flexibility services (Active Power and Reactive Power) can be procured as part of an energy market for balancing services.

​

​

​

​

​

​

​

​

Cornwall.jpg

Generation Predictor
 

Main Functionality :

The Predictor provides short and long range predictions of Generation for use in the decision making processes. It uses neural forecasting to predict  DER output based on historical data and current weather forecasts , date time and other factors. It supports an active learning process where the neural model is continually learning from historical data to optimise the accuracy of the predictions.

shutterstock_607919744.jpg

Main Functionality :

Virtual Power Plant
 

The Virtual Power Plant Module (VPP) can provide ongoing MW and MVAr support services at the point of delivery i.e. the Grid Supply Point. The VPP module determines the amount of MW and MVAr available in realtime from each of the participating DERs , allowing for network constraints and provides an aggregated MW and MVAr

Mongolia_1.jpg

Future Services / Congestion Forecasting
 

Main Functionality :

Congestion forecasting integrates demand and generation predictions with thermal and voltage constraint management. Driven by the NOVA Prediction engine and live weather forecasts this module identifies possible network constraints and the level of DER curtailment required to mitigate them. The results can then be reported to planning engineers or utilised by market based modules to procure services ahead of time.

Weather.jpg

Demand Prediction
 

Main Functionality :

The Predictor provides short and long range predictions of system loads for use in the decision making processes. It uses neural forecasting to predict  demand based on historical data. It supports an active learning process where the neural model is continually learning from historical data to optimise the accuracy of the predictions.

Energy Market Process Flow

Day-Ahead Market

Realtime

Demand Prediction

Generation Prediction

Future Services

Virtual Power Plant

DER

SCADA / DMS System

Settlement_Periods.png
Market_Phases.png
Anchor 1

Level 3 - Control Centre

Level 2 - Substation

Level 1 - Field

DMS / SCADA

Core

Primary_Substation_GSP_External_v100.jpg

  Distribution RTUs

ZOOM_Main_Model_Level_3A_edited.jpg

DER Interface

BESS_Control_v102.jpg

Centralised (Direct)

​

System Deployed at Level 3 with a datalink directly from the Level 3 Control system to the DERs. The Level 3 System interfaces with the DMS / SCADA System. Automation is deployed centrally.

Anchor 2
BSI_9000.png

SiliconGrid Ltd.   FS749888

BSI_27001.png

SiliconGrid Ltd.   IS749887